
Hago, Küssaberg
The modernisation of an existing warehouse with a 30 m high-bay warehouse called for particularly finesse. The rack was a special design with IPE traverses and the customer wanted the best possible overall solution.
Here we focussed on the particularly quick and easy assembly of the rack gratings. This involved an huge outlay due to the enormous rack height and the large amount of gratings installed. Thanks to a special edging system we developed, there was no need for additional securing with fixing elements. Using an edging recess, rack gratings are automatically locked in place by inserting them with the IPE support.
Do you too need a smart solution to reduce assembly times in the area of warehouse technology? Then please feel free to contact us.